Quick answer
A focused wet-area remodel — like a tub-to-shower conversion or shower replacement — is meaningfully faster than a full custom tile build, and a full bathroom remodel takes longer because more trades and materials are involved. We give you a specific timeline at your consultation once we've seen the space, rather than publishing a blanket promise. Standardized systems and fewer subcontractor handoffs are what keep our timelines predictable.
Why standardized systems are faster
Traditional tile showers involve waterproofing, setting many small tiles, grouting, and curing — days of work with several trades. Large-format, grout-free wall systems remove much of that, which shortens the install and cuts the dust.
What can extend a timeline
Hidden water or structural damage, custom glass lead times, and full-room scope (vanity, flooring, electrical) all add time. We flag these at the consultation so your schedule is realistic.
Want a number for your bathroom?
The most accurate answer is a free, written quote after we see your space.